..
The Hangzhou-Shaoxing Section of the Xifu Line of G2501 Hangzhou Ring Expressway has attracted much attention. Now, the project has passed the acceptance inspection, which means that it is ready for opening. The section is expected to be opened to traffic by the end of this year.